Skip to content
Illustrative property plans and measuring tools on a desk
Property & Building

SAP Assessment

Price on request

SAP calculations assess dwelling energy performance using information about its design and building systems. Project stage and available specifications determine the information needed.

KNOW WHAT YOU ARE BOOKING

What is SAP Assessment?

SAP is the Standard Assessment Procedure used to calculate the energy performance of dwellings. A SAP assessment uses detailed information about a proposed or completed home, including its construction and building services. It supports the applicable energy compliance process and production of an appropriate new-dwelling EPC, with requirements determined by the project and relevant regulations.

Illustrative London residential street

Inside this service

The model brings together geometry, insulation performance, openings, thermal bridging, heating, hot water, ventilation and relevant renewable systems. Design-stage calculations use the proposed specification; as-built work must reflect what was actually installed. The assessment is one part of a wider compliance process and does not replace structural design, ventilation design or building-control approval.

Design: Plans and specifications; Model: Fabric and building services; Review: Resolve specification changes; As built: Evidence and final outputs
An illustrated guide to the key parts of this service.

When this service may help

Developers, self-builders, architects and owners creating new dwellings or undertaking certain conversion projects may need SAP calculations. Involving the assessor while specifications can still change helps identify potential issues before construction is complete. Explain whether the instruction is for design-stage advice, an as-built assessment or both, and identify the building-control route.

Getting ready for the assessor

Provide dimensioned plans, elevations and sections, construction build-ups and product specifications. Include information about heating, ventilation, glazing and any proposed renewable systems. For completed work, gather installation evidence and applicable test results. Tell us when plans or products change so assumptions can be reviewed rather than carried forward incorrectly.

Using your completed report

The agreed deliverables may include calculations, compliance outputs and an EPC at the appropriate stage. The quotation will identify which stages are included and whether revisions are covered. Retain the supporting evidence with the project records. Early assessment can help compare options, but a design-stage result is not a guarantee of the finished building’s outcome.

Quotation after scope review

Arrange your SAP Assessment

Share the address and the work you need so we can help you take the next step.

BEFORE YOU BOOK

Questions before you arrange a visit

Is SAP the same as an existing-home EPC visit?

No. SAP generally uses detailed design and construction information. Existing-home EPCs usually follow a reduced-data assessment route.

When should I arrange it?

Ideally while the design is being developed, before insulation and building-services specifications are fixed or installed.

Can you work from drawings?

Design-stage assessment relies heavily on drawings and specifications. Final outputs require suitable as-built information and evidence for the project.

What should I send for a quote?

Provide the number of dwellings, project type, plans, stage of work and whether design-stage, as-built or both services are required.

Further reading: GOV.UK: Standard Assessment Procedure.

Included in your agreed instruction

  • The SAP assessment work and project stage specified in your quotation.
  • The calculations and documentation expressly agreed for the instruction.

Separate work & possible extras

Architectural design, building works and revisions caused by changed specifications require agreement.

Before the visit

Provide the plans, construction specification, energy systems and project stage. Flag any outstanding design information.

Report timing & deadlines

Report timing is confirmed for the agreed instruction. Missing evidence, access limitations or further investigation can affect completion. If you have a deadline, contact us before paying so we can confirm whether it can be met.

Preferred appointment dates are requests until confirmed. Extra work or a change to scope needs agreement before it is carried out.