Confirm the installation
Tell UPC how many fuse boards there are, the estimated circuit count and whether the building has shared or commercial areas. Mention any known faults.
Make access practical
The engineer needs access to the agreed parts of the installation. Clear the area around the consumer unit and discuss access to sockets, outbuildings and locked rooms.
Plan for interruptions
Testing may require power to be switched off. Tell the engineer about sensitive equipment and agree arrangements with occupants before the visit.
Read the findings
An EICR records observations and limitations. Inspection and repair are different services: any recommended investigation or remedial work needs an agreed scope.
General preparation guidance. The appropriate scope depends on your property and instruction.
Browse all guides